High-speed route
Etihad Rail
Abu Dhabi → Fujairah · United Arab Emirates
- Distance
- 250 km
- Fastest time
- 1 h 45 min
- Average speed
- 143 km/h
- Top speed
- 200 km/h
- Operator
- Etihad Rail
- Train
- CAF intercity sets
- Countries
- United Arab Emirates
- In service since
- 2026
Figures are published values, not live data · corrections log
The UAE’s first passenger railway, launched June 2026: 200 km/h out of Abu Dhabi and through Hajar mountain tunnels to Fujairah in 105 minutes.
How this line was checked
- Checked against OpenStreetMap: the whole line lies on real track, a median 3 m from it
- The operator publishes this line's timetable: Etihad Rail — a place to look it up, not a check of our drawing
- Wikipedia has an article for this line
More high-speed routes
- Eurostar
Drops 75 m below the sea through the 50.5 km Channel Tunnel, 37.9 km of it under the seabed, the longest undersea stretch of any rail tunnel.
Wikipedia ↗ - TGV inOui
France’s original 1981 LGV forms the first leg; today the TGV holds 320 km/h nearly all the way to the Mediterranean.
Wikipedia ↗ - AVE
Scheduled at 310 km/h, Europe’s fastest timetable, this line flipped one of the world’s busiest air routes to rail.
Wikipedia ↗ - AVE
Spain’s first AVE, built for Expo ’92 in standard gauge, the line that reset Spanish railways.
Wikipedia ↗