High-speed route
Avant Málaga–Sevilla
Málaga → Seville · Spain
Andalusia’s own high-speed shuttle: Málaga to Seville via Córdoba’s mezquita city in two hours, on the S-104 sets built for exactly this.
- Distance
- 290 km
- Fastest time
- ≈ 2 h 05 min
- Average speed
- 139 km/h
- Top speed
- 250 km/h

Stations
- 0 kmMálaga-María Zambrano +4
- 58 kmAntequera-Santa Ana +5
- 93 kmPuente Genil-Herrera +2
- 169 kmCórdoba-Julio Anguita +6
- 295 kmSevilla-Santa Justa +5
The stations that Wikidata lists as calls of this service, in order along the line as drawn here, with the distance along it. A train may skip some of them. A +N after a station: N other routes on this map stop or end there, and the map draws it as a station where lines meet.
How this line was checked
- The 144 km this route shares with OpenStreetMap relation 11887426 is drawn from that relation's own nodes, thinned to within under 25 m of them
- Checked against OpenStreetMap: 99.3% of this line lies within 250 m of real track (median 11 m); the longest stretch away from it is 2 km
- Checked against the running timetable via ÖBB Scotty: our line sits 0.1 km from the shape of A 8694
- Wikipedia has an article for this line
- See for yourself: open this line on the map with OpenStreetMap's own railway drawn underneath it
Questions and answers
How long is the Avant Málaga–Sevilla?
The Avant Málaga–Sevilla runs 290 km from Málaga to Seville.
How long does the Avant Málaga–Sevilla take?
The fastest scheduled journey is ≈ 2 h 05 min for the 290 km. That is an average of 139 km/h end to end. The line's top service speed is 250 km/h.
Who runs the Avant Málaga–Sevilla?
Renfe.
How old is the Avant Málaga–Sevilla?
The line has been in service since 2007. That is the year the atlas dates it from: for a modern brand running over an older railway, it is the railway's date, not the brand's.
More high-speed routes
- Eurostar
Drops 75 m below the sea through the 50.5 km Channel Tunnel, 37.9 km of it under the seabed, the longest undersea stretch of any rail tunnel.
Wikipedia ↗ - TGV inOui
France’s original 1981 LGV forms the first leg; today the TGV holds 320 km/h nearly all the way to the Mediterranean.
Wikipedia ↗ - AVE
Scheduled at 300 km/h, this line flipped one of the world’s busiest air routes to rail.
Wikipedia ↗ - AVE
Spain’s first AVE, built for Expo ’92 in standard gauge, the line that reset Spanish railways.
Wikipedia ↗
More train routes in Spain.
Planning this trip? Journey time & direct trains: Málaga → Seville · Seville → Málaga.