High-speed route
Guiyang–Nanning HSR
Guiyang → Nanning · China
350 km/h through Guizhou–Guangxi karst on a line that is mostly bridge and tunnel, passing the Libo World Heritage limestone scenery.
How this line was checked
- The 480 km this route shares with OpenStreetMap relation 11863395 is drawn from that relation's own nodes, thinned to within under 25 m of them
- Checked against OpenStreetMap: the whole line lies on real track, a median 3 m from it
- The operator publishes this line's timetable: China Railway 12306 — a place to look it up, not a check of our drawing
- Wikipedia has an article for this line
- See for yourself: open this line on the map with OpenStreetMap's own railway drawn underneath it
Questions and answers
How long is the Guiyang–Nanning HSR?
The Guiyang–Nanning HSR runs 482 km from Guiyang to Nanning.
How long does the Guiyang–Nanning HSR take?
The fastest scheduled journey is 2 h 53 min for the 482 km. That is an average of 167 km/h end to end. The line's top service speed is 350 km/h.
Who runs the Guiyang–Nanning HSR?
China Railway, with CR400AF Fuxing.
How old is the Guiyang–Nanning HSR?
The line has been in service since 2023. That is the year the atlas dates it from: for a modern brand running over an older railway, it is the railway's date, not the brand's.
More high-speed routes
- Eurostar
Drops 75 m below the sea through the 50.5 km Channel Tunnel, 37.9 km of it under the seabed, the longest undersea stretch of any rail tunnel.
Wikipedia ↗ - TGV inOui
France’s original 1981 LGV forms the first leg; today the TGV holds 320 km/h nearly all the way to the Mediterranean.
Wikipedia ↗ - AVE
Scheduled at 300 km/h, this line flipped one of the world’s busiest air routes to rail.
Wikipedia ↗ - AVE
Spain’s first AVE, built for Expo ’92 in standard gauge, the line that reset Spanish railways.
Wikipedia ↗
More train routes in China.