World Train Map

Scenic route

Hotan–Ruoqiang Railway

Hotan → Ruoqiang · China

Hotan–Ruoqiang Railway — Hotan to Ruoqiang
Photo · Prcshaw · CC BY-SA 4.0
Distance
825 km
Fastest time
11 h 26 min
Average speed
72 km/h
Top speed
120 km/h
Operator
China Railway
Train
25G coaches (diesel-hauled)
Countries
China
In service since
2022

Figures are published values, not live data · corrections log

The 2022 desert line that closed the world’s first rail loop around a sand sea — 825 km along the Taklamakan’s southern rim on viaducts built to let the dunes blow through.

How this line was checked

How long is the Hotan–Ruoqiang Railway?

The Hotan–Ruoqiang Railway runs 825 km from Hotan to Ruoqiang.

How long does the Hotan–Ruoqiang Railway take?

The fastest scheduled journey is 11 h 26 min for the 825 km. That is an average of 72 km/h end to end. The line's top service speed is 120 km/h.

Who runs the Hotan–Ruoqiang Railway?

China Railway, with 25G coaches (diesel-hauled).

How old is the Hotan–Ruoqiang Railway?

The line has been in service since 2022. That is the year the atlas dates it from: for a modern brand running over an older railway, it is the railway's date, not the brand's.

View on the world railway map →

Read more on Wikipedia ↗

More scenic routes

More train routes in China.