Scenic route
South-Link Line
Kaohsiung → Taitung · Taiwan
Taiwan’s last main line to be completed: 35 tunnels through the island’s southern spine to Duoliang’s celebrated platform above the Pacific.
How this line was checked
- Line drawn from OpenStreetMap relation 11352017 — the same nodes OpenStreetMap holds for this railway, thinned to within under 25 m of them
- Checked against OpenStreetMap: the whole line lies on real track, a median 4 m from it
- The operator publishes this line's timetable: Taiwan Railway — a place to look it up, not a check of our drawing
- Wikipedia has an article for this line
- See for yourself: open this line on the map with OpenStreetMap's own railway drawn underneath it
Questions and answers
How long is the South-Link Line?
The South-Link Line runs 160 km from Kaohsiung to Taitung.
How long does the South-Link Line take?
The fastest scheduled journey is 2 h 10 min for the 160 km. That is an average of 74 km/h end to end. The line's top service speed is 130 km/h.
Who runs the South-Link Line?
Taiwan Railway, with EMU3000 Tze-Chiang.
How old is the South-Link Line?
The line has been in service since 1992. That is the year the atlas dates it from: for a modern brand running over an older railway, it is the railway's date, not the brand's.
More scenic routes
- Glacier Express
“The world’s slowest express”: 291 bridges, 91 tunnels and the 2,033 m Oberalp Pass at an average of 36 km/h.
Wikipedia ↗ - Bernina Express
A UNESCO World Heritage railway: 7 % grades with no rack, the Brusio spiral, and the highest rail crossing of the Alps at 2,253 m.
Wikipedia ↗ - Bergensbanen
Northern Europe’s highest main line: over the bare Hardangervidda plateau at 1,237 m, through 182 tunnels.
Wikipedia ↗ - West Highland Line
Regularly voted the world’s most scenic railway: around Rannoch Moor and over the 21-arch Glenfinnan Viaduct of film fame.
Wikipedia ↗
More train routes in Taiwan.