World Train Map

Scenic route

South-Link Line

Kaohsiung → Taitung · Taiwan

Taiwan’s last main line to be completed: 35 tunnels through the island’s southern spine to Duoliang’s celebrated platform above the Pacific.

Distance
160 km
Fastest time
2 h 10 min
Average speed
74 km/h
Top speed
130 km/h

View on the map →Wikipedia ↗Stations · 32

South-Link Line, Kaohsiung to Taitung
Photo · jason199567 · CC BY-SA 4.0

Stations

  1. 0 kmKaohsiung
  2. 1 kmMinzu
  3. 3 kmScience and Technology Museum
  4. 4 kmZhengyi
  5. 6 kmFengshan
  6. 10 kmHouzhuang
  7. Show 21 more stations
    1. 14 kmJiuqutang
    2. 19 kmLiukuaicuo
    3. 21 kmPingtung
    4. 24 kmGuilai
    5. 26 kmLinluo
    6. 28 kmXishi
    7. 32 kmZhutian
    8. 36 kmChaozhou
    9. 41 kmKanding
    10. 43 kmNanzhou
    11. 47 kmZhen'an
    12. 50 kmLinbian
    13. 54 kmJiadong
    14. 57 kmDonghai
    15. 61 kmFangliao
    16. 67 kmJialu
    17. 70 kmNeishi
    18. 75 kmFangshan
    19. 82 kmFangye
    20. 105 kmDawu
    21. 117 kmLongxi
  8. 125 kmJinlun
  9. 136 kmTaimali
  10. 148 kmZhiben
  11. 155 kmKangle
  12. 159 kmTaitung

The stations OpenStreetMap maps along this line, in order along the line as drawn here, with the distance along it. Not every train stops at every station.

How this line was checked

  • Line drawn from OpenStreetMap relation 11352017: the same nodes OpenStreetMap holds for this railway, thinned to within under 25 m of them
  • Checked against OpenStreetMap: the whole line lies on real track, a median 4 m from it
  • Checked against the running timetable via Taiwan Railway: our line passes within 661 m of every station the Fast Local Train 3038 to Xinzuoying calls at (the operator publishes no route geometry to compare)
  • Wikipedia has an article for this line
  • See for yourself: open this line on the map with OpenStreetMap's own railway drawn underneath it

Questions and answers

How long is the South-Link Line?

The South-Link Line runs 160 km from Kaohsiung to Taitung.

How long does the South-Link Line take?

The fastest scheduled journey is 2 h 10 min for the 160 km. That is an average of 74 km/h end to end. The line's top service speed is 130 km/h.

Who runs the South-Link Line?

Taiwan Railway, with EMU3000 Tze-Chiang.

How old is the South-Link Line?

The line has been in service since 1992. That is the year the atlas dates it from: for a modern brand running over an older railway, it is the railway's date, not the brand's.

View on the world railway map →

Read more on Wikipedia ↗

More scenic routes

More train routes in Taiwan.