Classic route
Padua–Belluno railway
Padua → Belluno · Italy
From Padua across the Venetian plain by Castelfranco and Montebelluna into the Piave valley at Feltre and on to Belluno beneath the Dolomites; the line that gave Belluno its railway opened on 10 November 1886.
- Distance
- 111 km
- Fastest time
- 2 h 8 min
- Average speed
- 52 km/h

Stations
- 0 kmPadova +1
- 5 kmVigodarzere
- 11 kmCampodarsego
- 15 kmSan Giorgio delle Pertiche
- 18 kmCamposampiero
- 30 kmCastelfranco Veneto
Show 6 more stations
- 37 kmFanzolo
- 47 kmMontebelluna
- 54 kmCornuda
- 60 kmPederobba Cavaso Possagno
- 64 kmAlano Fener Valdobbiadene
- 69 kmQuero Vas
- 81 kmFeltre
- 88 kmBusche - Lentiai - Mel
- 95 kmSanta Giustina - Cesio
- 99 kmSedico - Bribano
- 111 kmBelluno
The stations OpenStreetMap lists for this service, in order, with the distance along the line as drawn here. A train may skip some of them. A +N after a station: N other routes on this map stop or end there, and the map draws it as a station where lines meet.
How this line was checked
- Line drawn from OpenStreetMap relation 20371217: the same nodes OpenStreetMap holds for this railway, thinned to within under 25 m of them
- Checked against OpenStreetMap: the whole line lies on real track, a median 2 m from it
- Checked against the running timetable via ÖBB Scotty: our line sits under 100 m from the shape of R 17322
- Wikipedia has an article for this line
Questions and answers
How long is the Padua–Belluno railway?
The Padua–Belluno railway runs 111 km from Padua to Belluno.
How long does the Padua–Belluno railway take?
The fastest scheduled journey is 2 h 8 min for the 111 km. That is an average of 52 km/h end to end.
Who runs the Padua–Belluno railway?
Trenitalia, with Regionale.
How old is the Padua–Belluno railway?
The line has been in service since 1886. That is the year the atlas dates it from: for a modern brand running over an older railway, it is the railway's date, not the brand's.
More classic routes
- LNER Azuma
The Flying Scotsman’s route since 1862, and where Mallard set the never-beaten steam record of 203 km/h in 1938.
Wikipedia ↗ - Alfa Pendular
A tilting Pendolino leaning through the curves of the 19th-century Linha do Norte between Portugal’s two great cities.
Wikipedia ↗ - EIP Pendolino
Rides Poland’s 1970s Central Main Line (CMK), engineered decades ahead of its time and now being upgraded to 250 km/h.
Wikipedia ↗ - Railjet
Follows the old Orient Express alignment down the Danube plain: centre to centre faster than any flight.
Wikipedia ↗
More train routes in Italy.