World Train Map

Classic route

Dresden–Görlitz railway

Dresden → Görlitz · Germany

View on the map →Wikipedia ↗Stations · 22

Dresden–Görlitz railway, Dresden to Görlitz
Photo · Derbrauni · CC BY-SA 4.0

Saxony end to end through Bautzen and the Lusatian hills, opened in stages from November 1845 and formally complete on 1 September 1847.

One of the oldest railways in Germany (the first section opened in 1845) and still a two-track main line, built by the Saxon-Silesian Railway Company across Upper Lusatia. It runs from Dresden by Bischofswerda, Bautzen and Löbau to Görlitz, and forms part of the route on to Wrocław and of Pan-European Transport Corridor III.

Stations

  1. 0 kmDresden Hbf +4
  2. 3 kmDresden-Neustadt +2
  3. 6 kmDresden Industriegelände
  4. 10 kmDresden-Klotzsche +1
  5. 14 kmLangebrück (Sachs)
  6. 20 kmRadeberg +1
  7. Show 11 more stations
    1. 25 kmArnsdorf (bei Dresden) +1
    2. 33 kmGroßharthau
    3. 37 kmWeickersdorf (Sachs)
    4. 40 kmBischofswerda +1
    5. 45 kmDemitz-Thumitz
    6. 51 kmSeitschen
    7. 59 kmBautzen
    8. 66 kmKubschütz
    9. 70 kmPommritz
    10. 74 kmBreitendorf
    11. 81 kmLöbau (Sachs)
  8. 87 kmZoblitz
  9. 91 kmReichenbach (Oberlausitz)
  10. 95 kmGersdorf (b Görlitz)
  11. 102 kmGörlitz-Rauschwalde
  12. 105 kmGörlitz

The stations on this line, as Wikidata lists them, in order along the line as drawn here, with the distance along it. Not every train stops at every station. A +N after a station: N other routes on this map stop or end there, and the map draws it as a station where lines meet.

Along the way

  • Bischofswerda
  • Bautzen
  • Löbau
  • Görlitz on the Neisse

How this line was checked

Questions and answers

How long is the Dresden–Görlitz railway?

The Dresden–Görlitz railway runs 105 km from Dresden to Görlitz.

How long does the Dresden–Görlitz railway take?

The fastest scheduled journey is ≈ 1 h 25 min for the 105 km. That is an average of 74 km/h end to end. The line's top service speed is 120 km/h.

Who runs the Dresden–Görlitz railway?

Die Länderbahn, with RE 1, trilex.

How old is the Dresden–Görlitz railway?

The line has been in service since 1847. That is the year the atlas dates it from: for a modern brand running over an older railway, it is the railway's date, not the brand's.

How often does the Dresden–Görlitz railway run?

33 direct trains on a weekday (counted on 2 September 2026).

View on the world railway map →

Read more on Wikipedia ↗

More classic routes

More train routes in Germany.