World Train Map

Classic route

Lower Left Rhine Railway

Krefeld → Kleve · Germany

Lower Left Rhine Railway — Krefeld to Kleve
Photo · Rob Dammers · CC BY 2.0
Distance
66 km
Fastest time
≈ 59 min
Average speed
67 km/h
Operator
RheinRuhrBahn
Train
RE 10 · Niers-Express
Countries
Germany
In service since
1863

Figures are published values, not live data · corrections log

The Rhine’s quiet left bank to the Dutch border: Kempen, Geldern, the pilgrim town of Kevelaer and Goch, on rails that reached Kleve on 1 March 1863.

The Linksniederrheinische Strecke keeps to the west bank of the Rhine, and its Cologne–Krefeld section — opened by the Cöln-Crefeld Railway Company in 1855 — is among the oldest in Germany. North of Krefeld the character changes: 65 km of non-electrified track, single from Geldern onwards, running up to Kleve. The continuation through Kranenburg to Nijmegen has been closed since 1991.

How this line was checked

Along the way

How long is the Lower Left Rhine Railway?

The Lower Left Rhine Railway runs 66 km from Krefeld to Kleve.

How long does the Lower Left Rhine Railway take?

The fastest scheduled journey is ≈ 59 min for the 66 km. That is an average of 67 km/h end to end.

Who runs the Lower Left Rhine Railway?

RheinRuhrBahn, with RE 10, Niers-Express.

How old is the Lower Left Rhine Railway?

The line has been in service since 1863. That is the year the atlas dates it from: for a modern brand running over an older railway, it is the railway's date, not the brand's.

View on the world railway map →

Read more on Wikipedia ↗

More classic routes

More train routes in Germany.