World Train Map

Classic route

Halle–Halberstadt railway

Halle → Halberstadt · Germany

View on the map →Wikipedia ↗Stations · 9

Halle–Halberstadt railway, Halle to Halberstadt
Photo · Falk2 · CC BY-SA 4.0

The Halle end of the line that reached Vienenburg in 1872, ninety two kilometres by Könnern, Sandersleben and Aschersleben to Halberstadt on the northern edge of the Harz.

A 123 km non-electrified main line north of the Harz, opened in sections between 1862 and 1872 by the Magdeburg–Halberstadt Railway Company and now the main link between Halle and the northern Harz towns. DB Netz maintains all of it except the disused stretch from Heudeber-Danstedt to Vienenburg; since 1996 that traffic has gone round to the south by Wernigerode. At the Halle end a separate single-track electrified S-Bahn line runs alongside as far as Halle-Trotha, with no connection between the two.

Stations

  1. 0 kmHalle (Saale) Hauptbahnhof +3
  2. 29 kmKönnern
  3. 41 kmBelleben
  4. 46 kmSandersleben (Anh)
  5. 58 kmAschersleben
  6. 65 kmFrose
  7. 68 kmNachterstedt-Hoym
  8. 72 kmGatersleben
  9. 90 kmHalberstadt Hauptbahnhof

The stations this train called at in the operator’s timetable (ÖBB Scotty, the RE 4 on 12 October 2026), in order along the line as drawn here, with the distance along it. Other runs of the train may skip some of them, and the timetable can change. A +N after a station: N other routes on this map stop or end there, and the map draws it as a station where lines meet.

How this line was checked

Questions and answers

How long is the Halle–Halberstadt railway?

The Halle–Halberstadt railway runs 92 km from Halle to Halberstadt.

How long does the Halle–Halberstadt railway take?

The fastest scheduled journey is ≈ 1 h 11 min for the 92 km. That is an average of 78 km/h end to end. The line's top service speed is 160 km/h.

Who runs the Halle–Halberstadt railway?

Start Mitteldeutschland, with RE 4, Regional-Express.

How old is the Halle–Halberstadt railway?

The line has been in service since 1872. That is the year the atlas dates it from: for a modern brand running over an older railway, it is the railway's date, not the brand's.

How often does the Halle–Halberstadt railway run?

19 direct trains on a weekday (counted on 2 September 2026).

View on the world railway map →

Read more on Wikipedia ↗

More classic routes

More train routes in Germany.