World Train Map

Scenic route

Qinghai–Tibet Railway

Xining → Lhasa · China

The roof-of-the-world railway: 5,072 m over the Tanggula Pass on permafrost, with oxygen piped to every seat.

Distance
1,956 km
Fastest time
≈ 21 h
Average speed
93 km/h
Top speed
160 km/h

View on the map →Wikipedia ↗Stations · 64

Qinghai–Tibet Railway, Xining to Lhasa
Photo · Jan Reurink · CC BY 2.0

Passengers sign a health declaration before boarding, because most of a day is spent above 4,000 m, where even the antelope look better acclimatised than you. The Golmud–Lhasa section, finished in 2006, was engineering at the edge of the possible, its track raised on cooled embankments and long bridges so migrating chiru can pass beneath. Outside, the Kunlun and Tanggula ranges scroll past salt lakes and nomad camps until prayer-flagged passes give way to the Lhasa valley.

Stations

  1. 0 kmXining West
  2. 10 kmShuangzhai
  3. 41 kmHuangyuan
  4. 72 kmHaiyan
  5. 109 kmQinghaihu
  6. 142 kmHaergai
  7. Show 53 more stations
    1. 172 kmGangcha
    2. 206 kmNiaodao
    3. 257 kmTianjun
    4. 296 kmChahannuo
    5. 333 kmWulan
    6. 352 kmKeke
    7. 408 kmTaoli
    8. 443 kmDelingha
    9. 493 kmLianhu
    10. 590 kmYinmaxia
    11. 597 kmYinmaxiaxi
    12. 613 kmXitieshan
    13. 664 kmDabuxun
    14. 678 kmChaerhan
    15. 736 kmGolmud East
    16. 743 kmGolmud
    17. 770 kmNanshankou
    18. 793 kmGanlong
    19. 826 kmNachitai
    20. 849 kmXiaonanchuan
    21. 867 kmYuzhufeng
    22. 885 kmWangkun
    23. 921 kmBudongquan
    24. 1,012 kmWudaoliang
    25. 1,049 kmXiushuihe
    26. 1,085 kmJiangkedong
    27. 1,107 kmRiachiqu
    28. 1,131 kmWuli
    29. 1,150 kmTuotuohe
    30. 1,170 kmKaixinling
    31. 1,192 kmTongtianhe
    32. 1,219 kmTanggang
    33. 1,244 kmYanshiping
    34. 1,266 kmBumade
    35. 1,291 kmBuqiangge
    36. 1,315 kmTanggula North
    37. 1,331 kmTanggula
    38. 1,351 kmTanggula South
    39. 1,370 kmZa'gyazangbo
    40. 1,409 kmTuoju
    41. 1,434 kmAmdo
    42. 1,463 kmLake Cona
    43. 1,483 kmLiantonghe
    44. 1,541 kmGangxiu
    45. 1,559 kmNaqu
    46. 1,622 kmSangxiong
    47. 1,645 kmGulu
    48. 1,684 kmWumatang
    49. 1,690 kmDiwuma
    50. 1,717 kmDamxung
    51. 1,753 kmDaqiongguo
    52. 1,773 kmYangbaling
    53. 1,790 kmYangbajing
  8. 1,809 kmAngga
  9. 1,822 kmMaxiang
  10. 1,839 kmGurong
  11. 1,862 kmLhasa West
  12. 1,873 kmLhasa +2

The stations on this line, as Wikidata lists them, in order along the line as drawn here, with the distance along it. Not every train stops at every station. A +N after a station: N other routes on this map stop or end there, and the map draws it as a station where lines meet.

Along the way

  • Qinghai Lake grasslands
  • Kunlun Mountains gateway at Golmud
  • Hoh Xil antelope reserve
  • Tanggula station, the world’s highest
  • Nagqu nomad plains
  • prayer flags of the Lhasa valley

How this line was checked

Questions and answers

How long is the Qinghai–Tibet Railway?

The Qinghai–Tibet Railway runs 1,956 km from Xining to Lhasa.

How long does the Qinghai–Tibet Railway take?

The fastest scheduled journey is ≈ 21 h for the 1,956 km. That is an average of 93 km/h end to end. The line's top service speed is 160 km/h.

Who runs the Qinghai–Tibet Railway?

China Railway, with Oxygen-enriched coaches.

How old is the Qinghai–Tibet Railway?

The line has been in service since 2006. That is the year the atlas dates it from: for a modern brand running over an older railway, it is the railway's date, not the brand's.

How high does the Qinghai–Tibet Railway climb?

5,072 m above sea level at its highest point.

View on the world railway map →

Read more on Wikipedia ↗

More scenic routes

More train routes in China.