High-speed route
TGV / ICE
Paris → Frankfurt · France · Germany
View on the map →Wikipedia (FR) ↗Stations · 6
A Franco-German alliance since 2007: 320 km/h on the LGV Est to Lorraine, then the Saar and Rhine-Main into Frankfurt, TGV and ICE sharing the run.
Stations
- 0 kmGare de l'Est
- 369 kmForbach
- 379 kmSaarbrücken Hauptbahnhof
- 445 kmKaiserslautern Hauptbahnhof
- 508 kmMannheim Hauptbahnhof
- 586 kmFrankfurt (Main) Hauptbahnhof
The stations OpenStreetMap lists for this service, in order, with the distance along the line as drawn here. A train may skip some of them.
How this line was checked
- Line drawn from OpenStreetMap relation 2078076 — the same nodes OpenStreetMap holds for this railway, thinned to within under 25 m of them
- Checked against OpenStreetMap: the whole line lies on real track, a median 8 m from it
- Checked against the running timetable via ÖBB Scotty: our line sits under 100 m from the shape of TGV 9551
- Wikipedia has an article for this line
- See for yourself: open this line on the map with OpenStreetMap's own railway drawn underneath it
Questions and answers
How long is the TGV / ICE?
The TGV / ICE runs 573 km from Paris to Frankfurt. It runs through France and Germany.
How long does the TGV / ICE take?
The fastest scheduled journey is 3 h 49 min for the 573 km. That is an average of 150 km/h end to end. The line's top service speed is 320 km/h.
Who runs the TGV / ICE?
SNCF and Deutsche Bahn, with TGV Euroduplex, ICE 3.
How old is the TGV / ICE?
The line has been in service since 2007. That is the year the atlas dates it from: for a modern brand running over an older railway, it is the railway's date, not the brand's.
How often does the TGV / ICE run?
7 direct trains on a weekday (counted on 2 September 2026).
More high-speed routes
- Eurostar
Drops 75 m below the sea through the 50.5 km Channel Tunnel, 37.9 km of it under the seabed, the longest undersea stretch of any rail tunnel.
Wikipedia ↗ - TGV inOui
France’s original 1981 LGV forms the first leg; today the TGV holds 320 km/h nearly all the way to the Mediterranean.
Wikipedia ↗ - AVE
Scheduled at 300 km/h, this line flipped one of the world’s busiest air routes to rail.
Wikipedia ↗ - AVE
Spain’s first AVE, built for Expo ’92 in standard gauge, the line that reset Spanish railways.
Wikipedia ↗
More train routes in France · Germany.
Planning this trip? Journey time & direct trains: Frankfurt → Paris · Paris → Frankfurt.