Classic route
Avezzano–Roccasecca railway
Roccasecca → Avezzano · Italy
View on the map →Wikipedia (IT) ↗Stations · 22
Up the Liri from Roccasecca by Arce, Sora and Balsorano into the Fucino basin; eighteen years from the first section in 1884 to the last on 20 August 1902.
Known as the Ferrovia del Liri, this single unelectrified track leaves Avezzano and crosses the Valle Roveto, then follows the floor of the Liri valley through Sora to meet the Rome–Naples main line at Roccasecca. Trenitalia regionale railcars take just under two hours over the 80 km.
Stations
- 1 kmRoccasecca
- 6 kmColfelice
- 10 kmArce
- 13 kmFontana Liri Inferiore
- 14 kmFontana Liri
- 18 kmSantopadre
Show 11 more stations
- 20 kmArpino
- 25 kmIsola Liri
- 30 kmSora
- 35 kmCompre-San Vincenzo
- 40 kmRidotti-Collepiano
- 43 kmBalsorano
- 44 kmRoccavivi
- 47 kmSan Vincenzo Valle Roveto
- 51 kmMorrea-Castronovo-Rendinara
- 54 kmCivita d'Antino-Morino
- 60 kmCivitella Roveto
- 63 kmCanistro
- 66 kmPescocanale
- 68 kmCupone
- 71 kmCapistrello
- 80 kmAvezzano +1
The stations on this line, as Wikidata lists them, in order along the line as drawn here, with the distance along it. Not every train stops at every station. A +N after a station: N other routes on this map stop or end there, and the map draws it as a station where lines meet.
Along the way
- Valle Roveto
- The Liri valley floor
- Sora
- Roccasecca junction on the Rome–Naples line
How this line was checked
- Line drawn from OpenStreetMap relation 5614081: the same nodes OpenStreetMap holds for this railway, thinned to within under 25 m of them
- Checked against OpenStreetMap: the whole line lies on real track, a median 3 m from it
- Checked against the running timetable via ÖBB Scotty: our line sits under 100 m from the shape of R 20194
- Wikipedia has an article for this line
- See for yourself: open this line on the map with OpenStreetMap's own railway drawn underneath it
Questions and answers
How long is the Avezzano–Roccasecca railway?
The Avezzano–Roccasecca railway runs 80 km from Roccasecca to Avezzano.
How long does the Avezzano–Roccasecca railway take?
The fastest scheduled journey is ≈ 1 h 58 min for the 80 km. That is an average of 41 km/h end to end.
Who runs the Avezzano–Roccasecca railway?
Trenitalia, with Regionale.
How old is the Avezzano–Roccasecca railway?
The line has been in service since 1902. That is the year the atlas dates it from: for a modern brand running over an older railway, it is the railway's date, not the brand's.
More classic routes
- LNER Azuma
The Flying Scotsman’s route since 1862, and where Mallard set the never-beaten steam record of 203 km/h in 1938.
Wikipedia ↗ - Alfa Pendular
A tilting Pendolino leaning through the curves of the 19th-century Linha do Norte between Portugal’s two great cities.
Wikipedia ↗ - EIP Pendolino
Rides Poland’s 1970s Central Main Line (CMK), engineered decades ahead of its time and now being upgraded to 250 km/h.
Wikipedia ↗ - Railjet
Follows the old Orient Express alignment down the Danube plain: centre to centre faster than any flight.
Wikipedia ↗
More train routes in Italy.